Инструкция на Одноступенчатые чиллеры York серии YIA-ST-1A1 THROUGH, YIA-ST-14F3 (STEAM), YIA-HW-1A1 THROUGH, YIA-HW-14F3 (HOT WATER). Руководство по эксплуатации.
Смотрите также: Основной документ →
Загружаем документ…
Текст инструкции
-
ISOFLOW ABSORPTION CHILLERS
WITH BUFFALO PUMPS INSTALLATION INSTRUCTIONS Supersedes: 155.16-N3 (1094) Form 155.16-N3 (899) MODELS STEAM YIA-ST-1A1 THRU YIA-ST-14F3 HOT WATER YIA-HW-1A1 THRU YIA-HW-14F3 00101VIP
-
IMPORTANT!
READ BEFORE PROCEEDING! GENERAL SAFETY GUIDELINES This equipment is a relatively complicated apparatus. During installation, operation, maintenance or service, individuals may be exposed to certain components or conditions including, but not limited to: refrigerants, oils, materials under pressure…
-
CAUTION identifies a hazard which could lead to damage to the machine, damage to other equipment and/or environmental pollution. Usually an instruction will be given, together with a brief explanation. NOTE is used to highlight additional information which may be helpful to you. CHANGEABILITY OF…
-
NOMENCLATURE
The model number denotes the following characteristics of the unit: YIA – ST – 1A1 – 46 – B MODEL York IsoFlow Absorption Chiller HEAT SOURCE ST = Steam HW = Hot Water UNIT SIZE 1A1 thru 14F3 6 – S SPECIAL Special Tubes Contract Job DESIGN LEVEL ELECTRICAL 17 = 208-3-60 28 = 230-3-60 46 = 460-3-60…
-
INTRODUCTION
This instruction describes the installation of an IsoFlow Absorption Chiller with Buffalo pumps. The IsoFlow unit is a complete self-contained, forced circulation refrigeration system using steam or hot water as the activation medium. De-ionized water is used as the refrigerant and 55% concentrated…
-
INITIAL INSPECTION OF UNIT (CON’T)
SHIPMENT When received at the jobsite, all containers should be opened and contents checked against the packing list or shipping orders. Any material shortage must be reported to YORK immediately! (Refer to Shipping Damage Claims Form 50.15-NM). Model sizes 1A1 thru 10E3 are shipped as completely…
-
MAJOR COMPONENT LOCATION
REFRIGERANT CONDENSATE LINE TO EVAPORATOR (TYP 2) PURGE CHAMBER POWER PANEL OIL TRAP SOLUTION SOLUTION REFRIGERANT SUPPLY DUMP ANTI-FREEZE LINE TO VALVE LINE GENERATOR HIGH TEMPERATURE CUTOUT SWITCH HT1 GENERATOR OUTLET BOX SOLUTION SIGHT GLASS CONDENSER GENERATOR SOLUTION LINE TO ABSORBER SPRAYS…
-
FIG. 3
LD00937 UNIT RIGGING ONE PIECE UNIT SHIPMENT For lifting the unit, sling vertically. Position slings around the unit, at the girth bands provided under the lower shell. Use extreme care so as not to sling against, or on any projecting brackets, pipes, fittings or any apparatus which may be damaged…
-
TABLE 1 – UNIT WEIGHTS AND DIMENSIONS
Model Unit 1A1 1A2 2A3 2A4 2B1 3B2 3B3 4B4 4C1 5C2 5C3 6C4 7D1 7D2 8D3 8E1 9E2 10E3 12F1 13F2 14F3 UNIT WEIGHTS AND DIMENSIONS *Maintenance Overall Dimensions Approx. Shipping clearance (Feet - Inches)** Weight (lbs) (feet - inches) Length Width Height (either end) Total Max. Rig 12 - 2-1/2 14…
-
UNIT ASSEMBLY CONNECTIONS FOR TWO-PIECE SHIPMENTS
Units shipped in two pieces are charged with nitrogen at a pressure of approximately 2 psig. This charge should be retained until the unit piping is to be completed, at which time nitrogen pressure will be relieved. The nitrogen is relieved from the bottom shell through one of the charging/sample…
-
LD04712
13 FORM 155.16-N3 FIG. 4 – UNIT ASSEMBLY FOR MODELS 1A1 THRU 2A4
-
YORK INTERNATIONAL FIG. 5 – UNIT ASSEMBLY FOR MODELS 2B1 THRU 4B4 LD04713
-
LD04714
15 FORM 155.16-N3 FIG. 6 – UNIT ASSEMBLY FOR MODELS 4C1 THRU 6C4
-
YORK INTERNATIONAL FIG. 7 – UNIT ASSEMBLY FOR MODELS 7D1 THRU 8D3 LD04715
-
LD04716
17 FORM 155.16-N3 FIG. 8 – UNIT ASSEMBLY FOR MODELS 8E1 THRU 10E3
-
YORK INTERNATIONAL LD04717 FIG. 9 – UNIT ASSEMBLY FOR MODELS 12F1 THRU 14F3
-
INSTALLING THE ABSOLUTE PRESSURE GAUGE
UNIT WATER PIPING The absolute pressure gauge is shipped separately for field installation. Mount the gauge on the gauge bracket which is located on the lower shell of the unit adjacent to the purge piping. Use #10-24 UNC x 1 inch long flat head machine screws and #10-24 UNC hex nuts. Make sure the…
-
NOTES
1. Adjust the Flow Switch Paddle to the size of the pipe in which it is to be used. Trim extended paddle to the “L” dimension as follows: DIAMETER OF PIPE (INCHES) AND LARGER 2. The Flow Switch is to be installed and upright, as shown. 3. Screw the Flow Switch in position so that the paddle is at a…
-
LD00941
FIG. 12 – TYPICAL COOLING TOWER PIPING RUPTURE DISK AND RELIEF PIPING (HOT WATER UNITS ONLY) INLET STEAM PIPING (REFER TO FIG. 13) Only the IsoFlowTM absorption chillers that operate on hot water require a rupture disk. This disk is supplied by the factory and is sent with the chiller ship loose…
-
tion unit should be taken off the main steam supply line
from the top side to minimize the possibility of condensate carry-over. Additional consideration should be given to steam flow velocity, especially in those applications where noise is a factor. Generally speaking, steam velocities up to 6,000 fpm (30 m/s) will not produce an objectionable noise…
-
P = Pressure Gauge
TW = Test Thermowell STEAM CONTROL VALVE (YORK SUPPLIED) PRESSURE REGULATING VALVE MANUAL BLOCK VALVE STEAM STRAINER TW AUTOMATIC SHUT-OFF VALVE P P P 4 TO GLOBE VALVE ATER RHE D UPE DES EQUIRE IF R STEAM TRAP STEAM SUPPLY P ERA T INLE OR T STEAM SEPARATOR TW TW GEN BYPASS LINE ET 10 FE ARD UP-W TCH…
-
STEAM CONDENSATE RETURN SYSTEM
Steam condensate return systems should be designed in accordance with good engineering practice for the general purpose of removing condensate from the absorption unit’s generator and returning it to the boiler. Either an atmospheric or a vacuum condensate return system may be used with absorption…
-
Vacuum Breaker (if desired) – A vacuum breaker
will often not be necessary, but one can prevent condensate build up in the generator bundle of the chiller at part loads. If an atmospheric return system is used the generator will not operate in the vacuum region, but will operate at atmospheric pressure even at low load conditions. Throttling of…
-
coolant must be provided to cool the maximum condensate flow to the desired temperature. Coolers may be air or evaporatively cooled, providing they can produce the desired leaving condensate temperature. Coolant flow could be manually set for maximum load and allowed to operate continuously at that…
-
TABLE 2 – SHELL AND TUBE VOLUMES
Unit Model 1A1 1A2 2A3 2A4 2B1 3B2 3B3 4B4 4C1 5C2 5C3 6C4 7D1 7D2 8D3 8E1 9E2 10E3 12F1 13F2 14F3 CHILLER SHELL AND TUBE VOLUMES SHELL SIDE TUBE SIDE Gen / Cond Abs / Evap Absorber Evaporator Generator Gallons Liters Gallons Liters Gallons Liters Gallons Liters Gallons Liters 1004 1130 1264 1423…
-
LD00684 (R)
FIG. 14 – SYSTEM 1 - ATMOSPHERIC CONDENSATE RETURN SYSTEM 28 YORK INTERNATIONAL
-
LD00685 (R)
FIG. 15 – SYSTEM 2 - VACUUM CONDENSATE RETURN SYSTEM YORK INTERNATIONAL 29
-
FLOAT AND THERMOSTATIC
TYPE STEAM TRAP(S) STOP VALVE THERMOSTATIC TRAP AIR COOLANT CHECK VALVE 12" MIN. CONDENSATE, FLASH STEAM AND AIR GENERATOR CONDENSATE OUTLET CONDENSATE COOLER CONDENSATE AND AIR TO VACUUM CONDENSATE PUMP LD04748 FIG. 16 – SYSTEM 3 - VACUUM CONDENSATE RETURN SYSTEM WHEN INLET STEAM AND OUTLET…
-
outlet port. Therefore, keeping the flow constant while
the temperature changes. This can be done in two different ways depending on the valve manufacturer. See below Fig. 17 for valves manufactured by Honeywell. HOT WATER SUPPLY 3-WAY DIVERTING CONTROL VALVE TO GENERATOR Fig. 19 is a sample of a hot water piping arrangement for a YORK IsoFlowTM…
-
Automatic Shut-Off Valve – (failsafe) This valve must
shut off 100% of the hot water supply flow and be bubble tight during a cycling/safety shutdown or a power failure. The YORK supplied hot water control valve will remain in whatever position it happened to be in at the time of a power failure. Therefore, a valve that will completely shut-off hot…
-
ELECTRICAL CONNECTIONS
Included with the unit’s literature packet is an elementary and connection wiring diagram. Refer to this diagram for electrical connections. If this literature is not available, refer to York Forms 155.16-PA2 and 155.16W4, which can be obtained through the your local York Service office. Located in…
-
TABLE 3 – ELECTRICAL RATINGS
Chiller Model 1A1 1A2 2A3 2A4 2B1 3B2 3B3 4B4 4C1 5C2 5C3 34 Voltage (Volts-Ph-Hz) 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60…
-
TABLE 3 – ELECTRICAL RATINGS (Cont’d)
Chiller Model 6C4 7D1 7D2 8D3 8E1 9E2 10E3 12F1 13F2 14F3 Voltage (Volts-Ph-Hz) 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60 380-3-50 460-3-60 575-3-60 200/208-3-60 230-3-60…
-
LD04574
FIG. 20 – SYSTEM WATER PUMP AND FLOW SWITCH INTERFACE DETAILS 36 YORK INTERNATIONAL
-
NOTES
1. Steam/Hot Water Shutoff Valve (by others). 2. YORK supplied harness – customer to terminate field connection at actuator. 3. Customer supplied wiring. 4. Steam/Hot Water Valve Actuator, and Steam/Hot Water Valve supplied by York. 5. Customer supplied wiring for optional input/output features. 6.…
-
MICRO BOARD OPTIONAL CARDS LOCATION OF OPTIONAL CARD FILES POWER SUPPLY BOARD TRANSFORMER FUSE 26762A DIGITAL INPUT BOARD RELAY OUTPUT BOARD SUPPRESSOR START RELAY FIG. 22 – ISOFLOW MICRO PANEL CONTROL CENTER COMPONENT LOCATIONS 38 YORK INTERNATIONAL
-
TRANSFORMER
SWITCH, DISCONNECT 100 AMP FUSES, PRIMARY 1 FU & 2 FU FUSE, 10 AMP 60 HZ STANDARD UNITS MOTOR PROTECTOR (1 OL) MOTOR PROTECTOR (2 OL) MOTOR PROTECTOR (3 OL) CIRCUIT BREAKER 10 AMP SINGLE POLE CONTACTOR (1M) CONTACTOR (2M) CONTACTOR (3M) CIRCUIT BREAKER 2 POLE TRANSFORMER DISCONNECT SWITCH MOTOR…
-
CIRCUIT BREAKERS
TRANSFORMER MOTOR PROTECTOR (1OL) MOTOR PROTECTOR (2OL) DISCONNECT SWITCH MOTOR PROTECTOR (3OL) CONTACTOR (1M) CONTACTOR (2M) CONTACTOR (3M) TERMINAL BLOCK LD04803 50 Hz, 380 volt (VDE and European compliance) view shown minus door and wiring FIG. 24 – ISOFLOW POWER PANEL COMPONENT LOCATIONS 40 YORK…
-
INSULATION
YORK recommends that all absorption equipment be insulated properly to optimize operating performance, insure the safety of operating and plant personnel, prevent sweating, and to prevent crystallization up to eight hours during a power failure. YORK performance ratings are based on a properly…
-
TABLE 4 – APPROXIMATE INSULATION FOR HOT AND COLD SURFACES
Chiller Model 1A1 1A2 2A3 2A4 2B1 3B2 3B3 4B4 4C1 5C2 5C3 6C4 7D1 7D2 8D3 8E1 9E2 10E3 12F1 13F2 14F3 COLD SURFACES Evap. Heads Refrig. Outlet Refrig. Suction & & Box & Discharge lines End Sheets Pump (Tubular insul.) (Sq. Feet) (Sq. Feet) (Dia. inch/lin feet) 2"/11', 4"/4' 2"/12', 4"/3' 2"/12'…
-
TABLE 5 – UNIT CHARGE QUANTITIES
Solution Charge Model Unit 1A1 1A2 2A3 2A4 2B1 3B2 3B3 4B4 4C1 5C2 5C3 6C4 7D1 7D2 8D3 8E1 9E2 10E3 12F1 13F2 14F3 Nominal Tonnage 1148 1235 1377 Charge Shipped Refrigerant Charge Charge Shipped Unit Charge3 Unit Charge Unit4 Alcohol Charge 3 Drums1 Pounds Gallons Pounds Gallons Drums2 Gallons…
-
INSTALLATION CHECK LIST AND REQUEST FOR AUTHORIZED START-UP ENGINEER
To: Job Name: District Service & Maintenance Manager Location: Customer Order No. York Tel. No. York Order No. ABSORPTION LIQUID CHILLER Model No. Serial No. This work (as checked below ) is in process and will be completed by Month Day Year The following work must be completed in accordance with…
Схемы, таблицы и рисунки — в просмотре документа выше. Клик по номеру страницы открывает её в просмотре.