Инструкция на Электрические котлы Protherm серии K, D (v10)
Электрические котлы Protherm серии K, D (v10). Инструкция по эксплуатации.
Загружаем документ…
Текст инструкции
-
Instructions for operation and
installation of electrical boiler PROTHERM K PROTHERM D Protherm, s. r. o. (Ltd.) 170 00 Praha 7, Jablonského 4 Czech Republic Tel.: 00420 2 66712424 Fax: 00420 2 805593
-
Dear customer,
You have become the owner of direct heated electrical boiler fitted with parts and equipment manufactured by the renowned producers. We believe you will use the PROTHERM boiler to your full satisfaction. However, it is necessary to meet at least the minimal requirements for operating the boiler.…
-
The boiler is equipped with cylindrical exchanger with heating elements, circulating
pump, manometer, thermometer, operation and breakdown thermostat and electronic switching block. The electrical boiler is built-in into a steel case. Its front and both sides create a mechanical unit attached by screws to back-wall. The circulating heating water inlet is at the bottom, outlet at the…
-
The signals above the buttons inform that the switches are on and the
heating elements in the electrical boiler heat. These signals do not shine permanently but they switch on or off in accordance of the boiler being turned on and off by the room regulator or boiler thermostat. If two or more boilers are operated in a cascade, the third button of each previous boiler…
-
time and level. The hot water distribution by the pumps is arranged so that there is no
mutual influence of the systems. As mentioned before, the electrical boiler output has to be set to compensate heat losses in both apartments. Once one apartment plus service water are heated, the service water exchanger tank has to be fitted, unless is has already been done by the manufacturer…
-
The manufacturer grants a guarantee under the condition that the installation will be
carried out by an authorized service organization! For this reason please contact our partners who will assist you in getting all technical documentation, do the boiler connection and advise you as to your heating system operation. After installation ask the expert for demonstration of the system…
-
In the heating systems where the water circulation can be completely closed by
thermostat controlled valves it is necessary to include a bypass between feeding and return water pipes. A cover sheet with a hole has to be slid on the pipe before you mount the pipe union with the cap nut connecting the pipe to the pump. The cover sheet is fitted with a flat connector where a…
-
When the electrical boilers are cascade connected, the main boiler is controlled by a
room regulator (terminals 15, 16). At the second and others the terminals for a room regulator are connected to terminals 19, 20 of the previous boiler – Fig. 10. Operation After the electrical boiler is connected into the heating system (according to local conditions), the system is filled with…
-
Certificate of product quality and completness Warranty and warranty conditions A warranty in accordance with Certificate of warranty and conditions listed in these instructions apply to the PROTHERM electrical boiler. Transportation and storage The boiler is protected for transportation and storage…
-
F1, F3
F2 line transformer fuses pump, contactor KM1, KM2 fuse H1 H2 H3 H4 H5 H6 KM1, KM2 signal of Ist output level (green) signal of IInd output level (green) signal of IIIrd output level (green) signal of HDO and operation of SS voltage source (white) signal of connection to line voltage (white) signal…
Схемы, таблицы и рисунки — в просмотре документа выше. Клик по номеру страницы открывает её в просмотре.