installation
operation and service instructions HP24 Series Units 502,801M 9/92 Supersedes 502,646M Litho U.S.A RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Page 1 Dallas, Texas
-
HP24 UNIT DIMENSIONS
INLET AIR FAN GUARD UNIT HP24-141 HP24-211 HP24-261 HP24-311 HP24-411/413 HP24-461/463 HP24-511/513 HP24-651/653 A B C 26-3/8" (670) 26-3/4" (670) 16-7/8" (429) INLET INLET 26-3/8" (670) 30-3/4" (781) 16-7/8" (429) AIR AIR 31-3/8" (797) 34-3/4" (883) 21-13/16" (538) INLET AIR TOP VIEW DISCHARGE AIR…
-
IĆSHIPPING AND PACKING LIST
Package 1 of 1 contains: INSTALLATION CLEARANCES 1- Assembled heat pump unit 36 (914 mm) 1- Bag assembly Check unit for shipping damage. Consult last carrier imĆ mediately if damage is found. These instructions are intended as a general guide and do not supersede local codes in any way. Authorities…
-
BĆSlab Mounting-Figure 2
When installing unit at grade level, top of slab should be high enough above the grade so that water from higher ground will not collect around unit. See figure 2. Slab should have a slope tolerance away from the building of 2 degrees or 2 inches per 5 feet (51 mm per 1524 mm). This will prevent ice…
-
TB1 TERMINAL STRIP
(INDOOR UNIT CONTROL BOX) FIELD WIRING DIAGRAM FOR HP24 UNIT 1 S1 THERMOSTAT R R G 2 E Y1 W1 G 3 W2 W1 W3 W2 Y2 C C LOW VOLTAGE FIELD INSTALLED NOTE-ALL REMAINING WIRES FACTORY INSTALLED RED (POWER) YELLOW (COMPRESSOR) USED ONLY WHEN OPTIONAL SERVICE LIGHT AND AMBIENT SENSOR ARE USED. CONNECTIONS…
-
A-Sweat Connection Procedure
1- End of refrigerant line must be cut square, free from nicks or dents, deburred. Pipe must remain round, do not pinch end of line. (I.D. and O.D.) 2- The thermometer well (packaged separately and atĆ tached to the liquid line) should be installed in the liquid line close to the HP24 unit as shown…
-
2Ć Open high pressure valve on gauge manifold and
pressurize line set and indoor coil to 150 psig (1034 kPa). 3Ć Check lines and connections for leaks. NOTEĆIf electronic leak collector is used, add a trace of refrigerant to the nitrogen for leak detection. 4Ć Release nitrogen pressure from the system. CorĆ rect any leaks and recheck. CĆSystem…
-
VIĆUNIT STARTĆUP AND ADJUSTMENTS
AĆStartĆUp APPROACH METHOD (Ambient Temperature of 60_F [16_C] or Above) 1Ć Rotate fan to check for frozen bearings or binding. 4Ć If outdoor temperature is 60_F (16_C) or above, the approach method of checking charge is used. The approach temperature is equal to the liquid line temĆ perature minus…
-
BLOCKING OUTDOOR COIL
OUTDOOR COIL SHOULD BE BLOCKED ONE SIDE AT A TIME WITH CARDBOARD OR PLASTIC SHEET UNTIL PROPER TESTING PRESSURES ARE REACHED. CARDBOARD OR PLASTIC SHEET FIGURE 8 Insert thermometer in well and check liquid line temĆ perature. Read liquid line pressure from gauge and convert to condensing temperature…
-
B-Crankcase Heater
defrost thermostat closes. The timer will not allow a deĆ frost to last for more than 14 minutes. The defrost timer can be field adjusted from a 60-minute to a 30- or 90-minĆ ute defrost interval if warranted by climatic conditions. IMPORTANT Crankcase heater (when provided) should be energized…