Инструкция на Горелки жидкотопливные серии PO MM Mk5
Жидкотопливные горелки серии PO MM Mk5. Инструкция по монтажу и эксплуатации.
Загружаем документ…
Текст инструкции
-
H ANDBOOK
® PO Series Automatic Oil Burners Fully Modulating Microprocessor Mini MM Mk.5 Controller With EGA P Series Contents Page A.1
-
CONTENTS
IMPORTANT INFORMATION A.4 SAFETY A.4 EMERGENCY INSTRUCTIONS A.4 EUROPEAN BOILER EFFICIENCY DIRECTIVE (B.E.D.) A.4 GENERAL INFORMATION B.1 INTRODUCTION B.2 FEATURES B.2 Burner Designation B.2 Burner Capacity B.2 Fuel B.2 Controls B.2 Operating Mode B.2 SITE CONDITIONS AND SERVICES B.3 Flue and…
-
General D.4 Oil Supply Temperature And Pressure D.4 Initial Checks D.4 Establishing The Flame D.4 FINAL COMMISSIONING STAGES D.6 Checking The Flame Signal D.6 Setting The Air Pressure Switch D.6 Set-Point Adjustment D.7 Final Checks D.7 On Completing Commissioning D.7 COMMISSIONING SHEET D.9 E…
-
IMPORTANT INFORMATION
SAFETY It is essential that the following instructions and adjustments are carried out by qualified engineers that are experienced in forced draught pressure jet oil burner commissioning. Nu-way cannot be held responsible for any consequential damage, loss or personal injury as a result of customers…
-
GENERAL INFORMATION
PO Series General Information Page B.1
-
INTRODUCTION
Fuel This handbook has been produced to enable users to install, commission and use P Series burners safely and efficiently. At each stage the conditions that should be met and the adjustments and other actions which should be carried out are detailed and the locations of the various components and…
-
Modulation By Electronic Cam System
There is some inherent hysteresis in all mechanical systems that traditionally involve cams and linkages to characterise the air/fuel ratio. To improve accuracy, P Series burners are now normally supplied with a system that overcomes all of these problems by utilising independently operated…
-
Oil Deliveries
It is good practice to shut down boilers whilst the delivery of oil is made and allow 30 minutes for oil sediment to settle out before re-starting the burners. Ring Main System The oil from the tank must be supplied to the burner from a pumped ring main system. A typical system is shown on Page B.9.…
-
Ensure that the joint between the burner and the mounting flange is sealed effectively using the gasket provided. The flame tube should not generally extend beyond the inner face of the furnace brickwork or the front plate protection, except where extensions have been expressly specified by the…
-
Page B.6
PO Series General Information
-
BURNER DESIGNA
TION CODE ESIGNATION PO Series General Information Page B.7
-
OIL HANDLING TEMPERA
TURES AND PRESSURES EMPERATURES Fuel Handling Temperatures (°C) Fuel Class D E F G Viscosity Minimum (Seconds) From Tank 1500 3500 4200 Burner Inlet Fuel Delivery Pressures Atomising Minimum 5 Recommended BURNER MOUNTING DET AIL ETAIL Page B.8 PO Series General Information 2 kg/cm psi 0.35 to 0.70 5…
-
TYPIC
AL PUMPED OIL RING MAIN YPICAL PO Series General Information Page B.9
-
AAD \P Series Burners\PFinal\B_Gen\PO\B_Gen.pmd
Rev. 140104A Page B.10 PO Series General Information
-
TECHNICAL SPECIFICATION
PO Series Technical Specification Page C.1
-
BURNER SPECIFIC
ATION SHEET PECIFICA Page C.2 PO Series Technical Specification
-
BURNER AND COMPONENT
IDENTIFIC ATION DENTIFICA Oil Controls The general arrangement of a PO burner employing Microprocessor Mini MM Mk. 5 modulation is shown in the diagram Burner and Component Identification on Page C.7. An enlarged view of the burner head casing is shown in the diagram on Page C.8. These diagrams are…
-
Control thermostat
Low limit thermostat (reverse acting) The return thermostat is fitted in the return oil line and will override the burner firing controls and start the burner oil pump in order to maintain the correct oil temperature in the nozzle and burner pipework. The thermostats should be set to the…
-
Flame Monitor
All P Series burners are fitted with continuous flame supervision systems employing an ultraviolet (UV) cell to detect the presence of a flame. Modulating Control And Operation The burner employs a microprocessor modulating controller. Detailed information of this system will have been provided…
-
Pressure Detector
The pressure detector (shown in the diagram on Page C.17) is specific to the modulation control system and is available in various ranges. BURNER OPERA TING SEQUENCE PERATING The operating sequence of P Series Burners (refer to the diagram Burner Sequence Timing Chart on Page C.15) begins with…
-
BURNER AND COMPONENT IDENTIFIC
ATION DENTIFICA PO Series Technical Specification Page C.7
-
Page C.8
PO Series Technical Specification
-
OIL PUMPS
PO Series Technical Specification Page C.9
-
DISTILL
ATE OIL CONTROL TRAIN SCHEMA TIC ISTILLA CHEMATIC Page C.10 PO Series Technical Specification
-
RESIDU
AL OIL CONTROL TRAIN SCHEMA TIC ESIDUAL CHEMATIC PO Series Technical Specification Page C.11
-
DISTILL
ATE OIL PUMPING SET ISTILLA Page C.12 PO Series Technical Specification
-
RESIDU
AL OIL PUMPING/HEA TING SET ESIDUAL EATING PO Series Technical Specification Page C.13
-
BURNER SEQUENCE CONTROLLER : LANDIS & STAEF
A LFL1.3 AEFA Page C.14 PO Series Technical Specification
-
BURNER SEQUENCE TIMING CHART
PO Series Technical Specification Page C.15
-
BURNER MODUL
ATION CONTROLLER : MINI MM MK. 5 ODULA POSITIONING MOTOR Page C.16 PO Series Technical Specification
-
TEMPERA
TURE AND PRESSURE DETECTOR EMPERATURE PO Series Technical Specification Page C.17
-
BURNER HEAD
Page C.18 PO Series Technical Specification
-
ELECTRODE SETTING DET
AIL ETAIL PO Series Technical Specification Page C.19
-
AAD P Series Burners\PFinal\C_Tech\Po\C_Tech.pmd
160104A Page 20 PO Series Technical Specification
-
COMMISSIONING
PO Series Commissioning Page D.1
-
INDIVIDUAL S ETTING R ECORD
- This manual contains a commissioning sheet (Page D.11) for essential information that should be completed by the commissioning engineer with individual details of the burner. These details should be verified periodically and changed as adjustments occur. - S AFETY - It is essential that…
-
- To prepare the burner for commissioning: 1. Check that the electrical power to the control panel and to the burner is off. 2. Check and if necessary re-set the ignition electrode gaps. The burner head arrangement is shown on Technical Specification Page C.18 and the electrode details are shown on…
-
7. 8. Ensure that the flame detection system detects the presence of a simulated flame or, where permissible an independent flame source. Remove the flame detector from the burner, expose the detector to a flame or simulated flame. This should cause a lockout indicated by illumination of the…
-
Press CLOSE. The CLOSE light will become steady and the ENTER light will begin to flash. If the CLOSE light remains flashing then the controlling instruments are not calling for heat and appropriate action must be taken. The LCD panel will display the default closed positions for the fuel valve…
-
18. 29. 20 21 22. 23. 24. 25. 26. 27. 28. 29. 30. Continue increasing the firing rate until the appropriate spill pressure is achieved. Check that the combustion is clean. If the CO 2 is too low, press MM and slowly decrease the air valve position by using the CH2 DOWN arrow button to give the…
-
Final Checks
7. Turn the dial one division anti-clockwise and re-set burner lock-out. The burner will then continue through its cycle until either the start rate flame is established or burner goes to its lock-out position. If the burner goes to lock-out, repeat the procedure (turning the dial one division) once…
-
Page D.8
PO Series Commissioning
-
COMMISSIONING SHEET : OIL
PO Series Commissioning Page D.9
-
Page D.10
PO Series Commissioning
-
Page D.11
-
AAD P Series Burners\PFinal\D_Comm\Po\D_Comm.pmd
-
E : OPERATION AND MAINTENANCE
PO Series Operation And Maintenance Page E.1
-
NORMAL OPERA
TION PERATION Combustion Air Pressure Switch 1. Automatic Modulation 1. 2 3. Establish the electrical power supply to the control panel. Ensure that the oil supply is operational at the correct temperature and pressure Switch on the burner. The burner will go through the ignition sequence and be…
-
Clean the fan blades with a stiff brush, taking care
not to damage them. Inspect the burner air inlet and ensure that there is no obstruction to the air flow. Replace the plate and retaining nuts. Burner Inner Assembly Air Diffuser Remove the burner air diffuser plate for inspection and cleaning as follows: 1 Remove the UV cell from its holder and…
-
The burner is correctly wired The fuses are correctly sized and not blown The motor overload is not tripped The burner controller is not locked out The appliance controls are calling for heat The oil preheater thermostats and oil temperature Fan Motor Starts And Burner Goes To Lockout If there is no…
-
BURNER SERVICE RECORD
PO Series Operation And Maintenance Page E.5
-
Page E.6
PO Series Operation And Maintenance
-
Page E.7
-
Page E.8
PO Series Operation And Maintenance
-
Page E.9
-
Page E.10
PO Series Operation And Maintenance
-
AMH D:\Local Work\Manuals & Data Sheets\P
Схемы, таблицы и рисунки — в просмотре документа выше. Клик по номеру страницы открывает её в просмотре.