Инструкция на Воздушные завесы VTS серии WING II
Модели: WING II W100, W150, W200, E100, E150, E200, C100, C150, C200 (EC). Техническая документация: технические данные, монтаж, подключение, управление, обслуживание. Документ на английском языке.
Загружаем документ…
Текст инструкции
-
EN
-
WING C100-200
-
1. INTRODUCTION 1.1. PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS 1.2. TRANSPORT 1.3. INITIAL STEPS TAKEN BEFORE THE INSTALLATION 2. STRUCTURE, INTENDED USE, PRINCIPLE OF OPERATION 2.1. INTENDED USE 2.2. PRINCIPLE OF OPERATION 2.3. STRUCTURE (WING II W100-200/E100-200/C100-200) 2.4. OVERALL DIMENSIONS…
-
WING C100-200
1. INTRODUCTION 1.1. PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS Detailed analysis of this documentation, as well as assembly and use of equipment, according to the descriptions contained therein, and following all safety requirements, is the basis for the correct and safe operation of the device.…
-
2.3. STRUCTURE (WING 100-200)
WING II E100-200 – ELECTRIC AIR CURTAIN 1. Electric heaters 2. Transverse fan 3. Casing 4. Outlet grille 5. Side cover 6. Side cap 7. Motor 8. Control system WING II W100-200 – WATER AIR CURTAIN 1. Heat exchanger 2. Transverse fan 3. Casing 4. Outlet grille 5. Side cover 6. Side cap 7. Motor 8.…
-
WING C100-200
The range of the air jet - assembly height - horizontal installation - vertical installation fan speed height of assembly [m] WING W100, W150, W200 WING E100, E150, E200 WING C100, C150, C200 III H3 3.7 3.7 4.0 II H2 2.9 2.9 2.9 I H1 2.3 2.3 2.3 fan speed width of the door [m] WING W100, W150, W200…
-
3.2.1. HORIZONTAL ASSEMBLY WITH USING INSTALATION HANDLES
It is possible to assemble WING do the wall horizontally in two options: OPTION I: Assembling handles with their arms faced downwards. In this option you should first screw the installation handles to the wall (1) with intervals W1 for a 1m curtain (there are 2 installation hanles) and W1, W2 for…
-
WING C100-200
3.2.2. VERTICAL ASSEMBLY WITH USING INSTALATION HANDLES. It is possible to assemble WING to a wall vertically on both sides of the gate (with the motor on the bottom or on the top). For this option it is not important if you screw the handles down to the unit first and then screw the whole down to…
-
Note! Maximum operating pressure of the medium for water coils is 16 bar, tested pressure: 21 bar
Requirements of the quality medium for the water coils: Parameter Value Oil and grease < 1 mg/l pH at 25oC 8 to 9 Residual water hardness [Ca2+, Mg2+]/[HCO3-] > 0.5 Oxygen < 0.1 mg/l (as low as possible) VENTING OF DEVICE/DRAINING OF HEATING MEDIUM Ventilation of the water exchanger is carried out…
-
WING C100-200
-
4. ELEMENTS OF AUTOMATICS
Electrical connections can be carried out only by qualified electricians, according to the binding regulations of: ● industrial safety; ● sssembly instructions; ● technical documentation for each individual element of automatics. IMPORTANT! Study the original documentation delivered together with…
-
WING C100-200
5.2. OPERATION AND MAINTENANCE ● It is advised to carefully analyse all the operational and assembly guidelines listed in chapter 3 and 4. ● The casing of the device does not require maintenance. ● The heat exchanger should be cleaned on a regular basis from dust and fat deposit. It is especially…
-
It is forbidden to place, dispose of and store worn-out electric and electronic equipment, together with other waste. Dangerous compound contained in electronic and electric equipment have a very adverse impact on plants, micro-organisms, and, most importantly, on humans, as they damage our central…
-
WING C100-200
-
8.2 ELECTRIC AIR CURTAIN – WING II E100-200
-
WING C100-200
9. TECHNICAL INFORMATION TO THE REGULATION (EU) NO 327/2011 IMPLEMENTING DIRECTIVE 2009/125/EC 1. WING II 100 WING II 150 WING II 200 24.2% 24.0% 24.6% 2. B 3. Total 4. 21 5. 21 21 VSD-No 6. 2020 7. VTS Plant Sp. z o.o., CRN 0000144190, Poland 8. 1-2-2801-0154 1-2-2801-0215 1-2-2801-0216 9. 0.41kW…
-
WING II 100 EC WING II 150 EC WING II 200 EC 28.5% 27.5% 28.0% 2. B 3. 4. Total 21 21 5. 21 VSD-No 6. 2020 7. VTS Plant Sp. z o.o., CRN 0000144190, Poland 8. 1-2-2801-0232 1-2-2801-0233 1-2-2801-0234 9. 0.36kW, 2826m³/h, 145Pa 0.43kW, 4239m³/h, 124Pa 0.61kW, 6006m³/h, 128Pa 10. 1376RPM 1370RPM…
-
WING C100-200
Complaint Form VTS POLSKA Sp. z o.o. Al. Grunwaldzka 472 A 80-309 Gdańsk Polska EN www.vtsgroup.com The company submitting the notification: The company that installed the equipment: Date of notification: EN Type of device: Factory number*: Date of purchase: Date of installation: Place of…