Каталог зарубежных проектов Lossnay
Каталог содержит примеры использования приточно-вытяжных установок с рекуператором Lossnay в отелях, офисах, школах, медицинских учреждениях и на объектах культурно-массового назначения. (Издание на английском языке).
Загружаем документ…
Текст каталога
-
Lossnay Job Reference
-
CONTENTS
Office building Fu-An Building HOY Architects & Associates Opus International Consultants Ministry of Finance Building Cork Country Council (Cork Ireland) Galway Financial Cetre Brinks Bank Security Company (Co Cork) 1_ 4 5_ 7 8 _ Hall & Library Ena Culture-Center 14 _ 17 Church 18 _ 20 University…
-
Building information
Taipei, R.O.C. Site : Architectural design Co. : Air conditioning design Co. : Construction operations Co. : HOY Architects & Associates Air conditioning installation Co. : TECO Electric & Machinery Co. Ltd Completion : 2005 Structure : above-ground floors and two below-ground floors Building area…
-
Equipments like blind boards or the like have been installed on
the southern face. Solar power panels have also been installed in order to reduce the heat irradiation into rooms by direct sunlight and utilize natural resources. Lengthwise cross section Sideways cross section It is designed to grow plants on stereoscopic and multistage beds in order to increase…
-
Air conditioning system design
-
Air conditioners lay out
-
Building information
Site : Christchurch, New Zealand. Architectural design Co. : Opus International Consultants Ltd Air conditioning design Co. : Beattie Air Conditioning Ltd Construction operations Co. : C.B.D. Construction Ltd Air conditioning installation Co. : Beattie Air Conditioning Ltd Completion : March, 2006…
-
Reception, ground floor
-
Air conditioners lay out
-
Building information
Site : Hanoi, Viet Nam Architectural design Co. : SAfi Deita Joint-venture co. Air conditioning design Co. : HP Ha Noi Construction operations Co. : General of Ha Noi contruction 4th co. Air conditioning installation Co. : TEMEX Co. LTD Completion : May, 2006 Structure : 12above-ground floors and…
-
Air conditioners lay out
First floor - fourth floor 1000m3/h HRV1.5 HRV HRV1.4 HRV HRV1.6 HRV HRV1.7 HRV HRV1.3 HRV HRV1.1 HRV HRV1.2 HRV Unit : mm 9
-
таблицы и схемы — в просмотре
-
Cork Country Council (Cork Ireland)
Building information Site : Cork Ireland Air conditioning installation Co. : Frank Roche Services Completion : December, 2002 Air conditioning method : Air cooled heat pump type VRF + HRV (Lossnay) Appearance In this building, outdoor air is supplied directly to an outdoor air processing unit (OA…
-
Galway Financial Cetre
Building information Site : Galway Ireland Air conditioning installation Co. : Kelly Refrigeration Completion : 2002 Air conditioning method : Air cooled heat pump type VRF + HRV (Lossnay) Appearance In the building, an air cooled heat pump type VRF is used with the heat recovery ventilator Lossnay.…
-
Brinks Bank Security Company (Co Cork)
Building information Site : Mallow Ireland Air conditioning installation Co. : Frank Roche Services Completion : December, 2002 Air conditioning method : Split type air conditioner + HRV (Lossnay) Appearance The building is very air-tight due to the severe climate, and there are very few windows out…
-
Building information
Site : Ena-City, Gifu, Japan Architectural design Co. : OKA SEKKEI.ARCHITECTS AND ENGINEERS Air conditioning design Co. : SANKI ENGINEERING CO.LTD Construction operations Co. : JDC Coporation Air conditioning installation Co. : SANKI ENGINEERING CO.LTD Completion : March, 1984 Structure : RC…
-
Lay out
Ground Floor 57000 7000 14000 36000 Large Props Storage Room Large Props Carry-in Entrance Corridor Promoters’ Office Children’s Reading Room Tea Room Corridor Exhibition Room 13500 Boiler Room Machine Room Public Lobby Office Entrance Hall Permanent Records Preservation Room Bookmobile Garage Lobby…
-
Lay out
Second Floor 52000 14000 30000 8000 Roof Upper Main Hall Skylight Upper Stage Spotlight Booth 36000 Side Spotlight Roof 63000 Side Spotlight Smoke Exhaust Room 73500 Ventilation Room Smoke Exhaust Room Ventilation Room Roof Lifts Machinery Room Skylight 73500 Roof Roof 7000 25000 49500 74500 Unit…
-
Building information
Site : Taipei, R.O.C. Architectural design Co. : Construction company name : Air conditioning installation Co. : Completion : 2006 Air conditioning method : Air cooled heat pump type VRF + HRV (Lossnay) Equipment list Ceiling concealed type Lossnay LGH-80RX4 2 units LGH-200RX4 8 units Wall mounted…
-
Air conditioning system design
-
Air conditioners lay out
To outdoor unit PUHY-700 HRV HRV To outdoor unit PUHY-750 Unit : mm 20
-
Building information
Site : Sao Paulo, Brazil Architectural design Co. : L.C.Esher & F.Spadoni Air conditioning design Co. : Termoplan Contruction operations Co. : Construtura MATEC Air conditioning installation Co. : Reclima Completion : 2006 Structure : Library, adminstration and classrooms (12,600 students every…
-
Air conditioners lay out
Typical floor installation HRV HRV HRV HRV HRV HRV HRV HRV HRV 22
-
Details about classroom
HRV 23
-
Building information
Site : Milan, Italy Completion : August, 2001 First Installation Air conditioning method : Air cooled heat pump type VRF + HRV (Lossnay, OA processing unit) Completion : December, 2004 Second Installation Air conditioning method : Air cooled heat pump type VRF + HRV (Lossnay) Appearance The air…
-
Equipment list for building GLOBO3
Commercial type Lossnay VRF controller LU-500 15 units TG-2000 1 piece G-50 3 pieces Air cooled heat pump type VRF outdoor unit PAC-SC50KUA 3 pieces PUHY-8MYA PAC-SF48MA 110 pieces PUHY-10MYA Totally 110 units Catwalk VRF Indoor unit Walkway Walkway Commercial type Lossnay LU-500 Air conditioning…
-
Air conditioners lay out
-
Office building & Factory
Building information Taipei, R.O.C. Site : Architectural design Co. : Air conditioning design Co. : Construction operations Co. : Air conditioning installation Co. : Mitsubishi Electric Taiwan Co., Ltd. Completion : September, 1994 Structure : 4 below-ground floors RC and 11 above-ground floors SC…
-
Office building & Factory
Air conditioners lay out Stairs Stairs Gentlemen WC VRF Outdoor Units HRV Tea Preparation Room Switchboard Room HRV Elevator Ladies WC HRV HRV 7-th floor air conditioning system design Unit : mm 28
-
School
Shanghai Japanese School Building information Shanghai, China Site : 2 Total floor area (m ) : 15,700 The indoor air quality for living and working environment is key issue, the forcible governmental regulation has been established in Shanghai recently. The introduction of fresh air into air…
-
таблицы и схемы — в просмотре
-
Public museum & Bank office
Fondazione Del Monte Building information Site : Bologna centre, Italy Air conditioning design Co. : Taddia & Sarti Impianti Air conditioning installation Co. : Taddia & Sarti Impianti Completion : July, 2002 Building area (m2) : 1,500 Total floor area (m2) : 380 (4 floors) Air conditioning method…
-
Hotel & Commercial center
HESPERIA TOWER Building information Site : Barcelona, Spain Architectural design Co. : Richard Rogers & Alonsoy Balaguer Air conditioning design Co. : Grupo JG Construction operations Co. : Construcciones Castro Air conditioning installation Co. : Climava Completion : 2005 Air conditioning method…
-
Hotel & Office building
Sorolla Hotel / Sorolla center Building information Site : Street Camp del Turia, Benlloch (Valencia), Spain Architectural design Co. : Guadalmedina Construction operations Co. : ICS/Saing Air conditioning installation Co. : Ballester Completion : November, 2006 Air conditioning method : Air cooled…
-
Nakatsugawa Works, 1-3 Komaba-cho, Nakatsugawa-shi, Gifu, Japan 508-8666
Y07-001 March.2007(MEE) Specifications subject to change without notice.
Схемы, таблицы и рисунки — в просмотре документа выше. Клик по номеру страницы открывает её в просмотре.