Plumbing. Heating. Conditioning. Energy Efficiency.

Drainage systems Perfokor

642 0
13 August 2012

The works on the arrangement of the drainage systems take place as part of the reconstruction program of the federal highway M-7 "Volga" between 613+000 — 623+500 km. The polymer corrugated pipes "Perfokor" and the wells "Korsis" are used.
These products are manufactured by the Group "Polyplastic", and the design and supply of the pipeline is being carried out by Cheboksary Pipe Plant, which is the part of the Group.

For the construction of drainage system 132 meters of corrugated pipes "Perfokor" and 10 wells "Korsis" with the diameter 1000 mm are used.
Now most of the work on laying of the drainage system on the road M-7 is finished.

Comments
  • В этой теме еще нет комментариев
Add a comment

Your name *

Your E-mail *

Your message